Blog

Power point installation cost: what changes the price

· 3 min read · Fins Up Electrical, licence 91921

5.0 on GoogleLicence 91921Open 24 hours, Mon to SatFree quotes

The cost of a power point comes down to how hard it is to get a cable to the spot you want it, what type of outlet you pick, and if your switchboard can take the new work. Swapping an old point for a double is the simplest job. A new point on a brick wall, outside, or on a new circuit takes more time and parts. We quote it free and fixed before we start, so you know the number up front.

Why does one power point cost more than another?

Most of the cost is labour, and labour depends on access. A point going on a plaster wall with an open roof space above it is quick. The cable drops straight down the wall cavity to the new spot.

Things that add time:

  • Brick or block walls. The cable has to be chased into the wall or run in surface conduit.
  • No roof access. Flat ceilings with no crawl space, or a second storey, mean the cable has to come from somewhere else.
  • Distance. A point at the far end of the house from the nearest circuit needs a longer run.
  • Finished surfaces. Tiled splashbacks and stone benchtops need care to cut without cracking.

Does it matter if it’s a replacement or a new point?

Yes. Replacing a single point with a double, or a worn point with a new one, uses the cable that’s already there. It’s usually a short job.

A brand new point needs a new cable run from an existing circuit, or sometimes a whole new circuit from the switchboard. A new circuit is more work again, and it also means checking the switchboard has room for it.

Can my switchboard affect the price?

It can. In Queensland, when new electrical work is added, the power point circuits it connects to must be protected by a safety switch. Homes with lighting and power circuits added also need safety switch protection on both. The Electrical Safety Office sets this out in its safety switch FAQ.

If your board is old and has no safety switch on the circuit we’re connecting to, we need to fit one before the job can be finished properly. If the board is full or worn out, it may need more work than that. We’ll tell you when we look at it, not after. See our switchboard upgrades page for what that involves.

What type of power point am I paying for?

The outlet itself changes the parts cost:

  • Standard single or double. The everyday point most homes use.
  • USB points. A double with USB-A or USB-C charging built in. Handy beside beds and in kitchens.
  • Weatherproof outdoor points. Built to keep rain and dust out. Needed anywhere exposed to weather.
  • Higher-rated outlets. Some appliances, like certain ovens, heaters or workshop gear, need a 15 or 20 amp outlet and usually their own circuit.

Finish matters too. A plain white plate costs less than a designer range in matte black or brushed metal.

Is it cheaper to do several points at once?

Usually, yes. A lot of the time on a single point is getting set up, finding the circuit and getting into the roof. Once that’s done, adding a second or third point nearby takes much less time each.

If you know you want points in the garage, the bedroom and the lounge, get them quoted together. The same goes for renovations. Adding points while the walls are open is far easier than cutting into finished plaster later.

Why not use a power board instead?

A power board is fine for a lamp and a phone charger. It isn’t a fix for a room that doesn’t have enough points. Stacking boards and double adaptors puts a lot of load through one outlet, and that’s where heat and damage start.

Installing or moving a power point is electrical work, and in Queensland it has to be done by a licensed electrician. The Electrical Safety Office lists installing a power point as a job you should never do yourself. DIY electrical work is illegal and your insurer may refuse a claim for a fire it causes.

How do I get a fixed price?

Tell us where you want the points, how many, and what type. A photo of the wall and your switchboard helps. Fins Up Electrical gives free quotes before any work starts, and Andrew, who’s had 16 years on the tools, will give you the price direct. We’re licensed (contractor licence 91921) and work across the Redcliffe peninsula and Moreton Bay. More detail on our power point installation page.

Want this sorted? Power point installation from Fins Up.

Licensed electrician, licence 91921. Free quote before any work starts. Open 24 hours Monday to Saturday.

Common questions

Do I need a licensed electrician to install a power point in Queensland?

Yes. Installing or moving a power point is electrical work, and in Queensland only a licensed electrician can do it. DIY electrical work is illegal.

Is replacing a single power point with a double expensive?

It’s one of the simpler jobs because it reuses the existing cable. The price still depends on the outlet you choose and the state of the wiring behind it.

Will adding a power point mean I need a safety switch?

If the circuit the new point connects to has no safety switch, one needs to be fitted. Queensland requires safety switch protection on power point circuits when new work is added.

Do you charge for quotes?

No. Fins Up Electrical quotes free and gives you a fixed price before the job starts.

Sources